A basin and mixer that belong together
We review basin dimensions and mixer height and reach as one selection, alongside the worktop and the space available for everyday use.
Bathrooms & Sanitary Ware
We coordinate the basin, mixer, shower, sanitary ware and vanity with the actual plumbing layout and the way you use the bathroom.
Discuss bathrooms & sanitary ware on WhatsAppBasins · mixers · showers · sanitary ware · vanities · accessories
We review basin dimensions and mixer height and reach as one selection, alongside the worktop and the space available for everyday use.
For concealed fittings, we identify the required bodies and connections before the finishes close them in. Drainage, mounting and service access are coordinated with the plumbing team.
The mixer, shower and accessories are reviewed together for finish and compatibility. We list the selected models and their necessary fitting components, alongside the vanity materials.
The supplier check covers model references, dimensions, visible finish and included fittings. We request relevant product reports and document agreed functional checks, while vanity fabrication follows its approved drawings.
We coordinate delivery with plumbing and finish readiness. Within the agreed scope, installation checks cover positioning, fitting and operation with the responsible trades, while maintenance access remains available.
13 steps, from your brief and measurements to approval, packing, shipping and installation.
Sanitary products are generally selected and sourced by model. Custom vanities, mirrors or glass follow their approved fabrication details when included in the order.
We discuss your bathroom routine, storage needs, preferred look and budget. We consider ease of cleaning and the practical use of each fitting.
A coordinated bathroom product brief.
We check room dimensions, fitting centres, service positions and mounting conditions. Clearances around toilets, basins and shower areas are reviewed before selection is finalised.
Measured fitting positions and service notes.
You compare selected models, metal finishes, ceramic tones and vanity materials. We coordinate the mixer and basin proportions with accessories and the surrounding surfaces.
Your bathroom model and finish schedule.
We prepare the relevant setting-out layouts, elevations and custom vanity or glass details. Supplier sheets are coordinated with the plumbing and mounting requirements.
Setting-out information and fabrication details where needed.
We review the complete bathroom selection with you, including what comes with each model. Revised dimensions or finishes are recorded before ordering.
Approved models, quantities and interface details.
Products are ordered by exact model and finish, while any custom items move into manufacture. Required mounting parts are included in the agreed specification.
A coordinated product and custom-item order.
The China team follows the selected supplier items and any fabrication. The Qatar team coordinates rough-in requirements, dimensions and site readiness with the responsible trades.
Linked product and site coordination.
Updates show the selected finishes, available products and custom-work progress. Any proposed substitution is brought back for agreement before the order changes.
Photographs and clear decisions on any open selection.
We inspect visible finishes, model references, dimensions and component completeness. Relevant supplier test information and connection details are reviewed within scope.
A fitting-by-fitting inspection record.
You review the final appearance and the completed set before packing. Agreed outstanding items are resolved, with technical responsibility retained by the assigned team.
Approval of the final selected set.
Ceramics, glass and finished metals receive suitable separation and cushioning. Boxes are identified by bathroom and fixture reference to simplify installation.
Protected, identified bathroom sets.
Delivery is coordinated with the completion of wet-area works and suitable storage. Shipment updates help the site team plan the fitting sequence.
An agreed arrival and installation arrangement.
The responsible installers complete the agreed mounting and connections, then coordinate leak, drainage and operation checks. We review finish and alignment at handover.
A coordinated bathroom, checked within the contracted scope.
Start a WhatsApp conversation with our Qatar team. We will review the requirements with you and arrange the next step.